[ stop the slideshow ]

Hot Suite Test Bed

5650/12821
Resized_image1029.jpg Resized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control deskResized image645ThumbnailsCACC Control desk

Heathrow (1985 approx.)
The test and development AFTN Message Switch. Built around a Ferranti Argos 500 plus some spare bits salvaged from a scrap Ferranti (Argus 600?) from the Radar Research establishment at Malvern.

Visible is the Ferranti main console with Westinghouse? Terminals, an ASR33 Teletype, Punch tape punches and readers (and a tape winder) plus a pair of clocks built around Nixie Tubes.